Project Scope
80 million gallon per day water plant expansion. The largest single utility infrastructure project ever built in Houston. Subcontractor to Pepper Lawson-Renda, LLC for Electrical, Instrumentation, and Security including:Temporary power; above-ground and below-ground duct banks; Switchgear expansions to the existing 138Kv Substation 12.4Kv switchgear to feed the Treatment Module 2 Addition and 7.2Kv Switchgear to feed the High Service Pump Station Expansion; Process Instrumentation and Controls; Networking and UPS; Fiber Optic Data Network for new/existing plant SCADA Communication; Security MUX panels for CCTV; Security Access; Fire Alarm System; Standby Diesel Engine Generators.