Project Scope
Underground 138kV Transmission Project on Old
Spanish Trail to serve the new Hermann Substation in the Medical Center,
Houston. Installation of 6-8”/4-3” Sch.
40 conduits encased in thermal concrete. The significance of thermal
concrete is to dissipate heat from the 138kV circuits to be installed by
others. Installed 1450lf of concrete encased underground ductbank 16-17’
depth, and a 5’x5’ ID wood box tunnel (165 LF) one Precast Manhole 12’x32’x8’
under Old Spanish Trail. Close attention to the quality of the
workmanship in the conduit installation is paramount, since there can be zero
blemishes, burrs are out of round conduits to meet the circuit installation
specifications. This project had a
critical timeline under the control of an ERCOT Outage, and the new circuits
had to be in placed by June 2025 with summer requirements and hurricane season.
Critical timelines were met in accordance.