Underground 138kV Transmission – Old Spanish Trail

Location: Houston, Texas
Project Type: Rehabilitation
Owner:
centerpoint
Amit Patel, Consultant Engineer 713.207.6720
Engineer:
Binkley Barfield Jose Villarreal 713.304.0217

Project Scope

Underground 138kV Transmission Project on Old Spanish Trail to serve the new Hermann Substation in the Medical Center, Houston.  Installation of 6-8”/4-3” Sch. 40  conduits encased in thermal concrete. The significance of thermal concrete is to dissipate heat from the 138kV circuits to be installed by others. Installed 1450lf of concrete encased  underground ductbank 16-17’ depth, and a 5’x5’ ID wood box tunnel (165 LF) one Precast Manhole 12’x32’x8’ under Old Spanish Trail.  Close attention to the quality of the workmanship in the conduit installation is paramount, since there can be zero blemishes, burrs are out of round conduits to meet the circuit installation specifications.   This project had a critical timeline under the control of an ERCOT Outage, and the new circuits had to be in placed by June 2025 with summer requirements and hurricane season. Critical timelines were met in accordance.

Project Details

Original Construction Cost
$3,112,426
Date of Notice to Proceed
09/24
Substantial Completion
06/2025
Project Manager
Barry Buse
Project Superintendent
Larry Currie
Final Construction Cost
$4,137,830
Type of Construction
Rehabilitation
Major Subcontractors
RCP Tunnel, LLC