Project Scope
Tunneling and installation of dual 72” diameter centrifugally cast fiberglass reinforced polymer motar (CCFRPM) siphon pipes with heavy structure concrete inlet and outlet structure. Limited canal and levee improvements consisting of rip-rap erosion protection and earth grading/slope repair. Maintained contractual flow of 63MGD across Baker Road at all times during construction utilizing Boyer design canal bypass system.