Project Scope
This project involved installation of
approximately 5000 LF of 10”,12”,15” & 18” sanitary sewer line by trenchless methods. The trenchless methods
used for pipe installation were micro-tunneling using pilot tube GBM and
conventional wet bore. With the pilot tube GBM we could go 450 ft. between pit
to pit and about 80-100 ft. with the conventional wet bore. Clay pipe was used
for the GBM and PVC sewer pipe for wet bore. Two of the biggest challenges on
this project were the unknown underground utilities and the location in a very
busy and high profile street, Post Oak Blvd. We had only one lane of traffic to
work in and had to take utmost care not to block traffic. Installed 33 bore and
receiving pits and 70% of the pits had existing utilities not shown on the
drawings. Despite the above challenges the project was completed on schedule
and under budget and turned out to be a successful project for the client
and Boyer.