Post Oak Blvd. Reconstruction South Package, Richmond Ave. to Westheimer Road

Location: Houston, TX
Project Type: Rehabilitation
Owner:
Uptown Development Authority (UDA) | Robert Taube | 713.621.2011
GC:
SER Construction Partners, LLC | Joseph Camp, Project Mgr. | 281.408.0528
Engineer:
Gunda Corporation | Shashider Velugati, PE | 713.541.3530

Project Scope

Constructed 2,735 linear feet of CenterPoint Energy 35kV primary duct bank for the dedicated Metro Bus Lane. This scope included a 150-linear-foot, 4’x6’ hand-mined boxwood tunnel under Westheimer Road. Additional deliverables featured manholes, handholes, transformer and switch pads at the proposed bus platforms, and lateral duct banks connecting to existing CenterPoint Energy manholes on Post Oak Blvd.

Project Details

Original Construction Cost:
$962,201
Final Construction Cost:
$1,347,201
Date of Notice to Proceed:
3/2018
Type of Construction:
Rehabilitation
Substantial Completion:
3/2019
Project Manager:
Barry Buse
Project Superintendent:
Emmitt Malmay
Major Subcontractor:
Boyer Self Performed