Project Scope
Constructed 2,735 linear feet of CenterPoint Energy 35kV primary duct bank for the dedicated Metro Bus Lane. This scope included a 150-linear-foot, 4’x6’ hand-mined boxwood tunnel under Westheimer Road. Additional deliverables featured manholes, handholes, transformer and switch pads at the proposed bus platforms, and lateral duct banks connecting to existing CenterPoint Energy manholes on Post Oak Blvd.