Project Scope
Installed 498-linear-foot CenterPoint Energy 35kV primary duct bank for the dedicated Metro Bus Lane. The project also included installing manholes, handholes, transformer and switch pads at the proposed bus platforms, and lateral duct banks connecting to existing CenterPoint Energy manholes on Post Oak Blvd.