PLC9 & PLC13 Migration Project

Location: Pasadena, TX
Project Type: Rehabilitation
Owner:
Gulf Coast Authority | Richard Sattelmaier, 832.215.5578
Engineer:
Kalluri Group, Inc. | Wade Hubble, PE | 713-365-9288

Project Scope

This project includes the phased removal, replacement, installation, and integration of multiple PLC systems and related infrastructure in the PLC9/9A facilities and adjacent MCC buildings. Work includes panel fabrication, cable routing, field installation, system integration with existing equipment, and commissioning support to provide fully tested, operational PLC systems. The project’s objective is to modernize and expand the PLC control infrastructure while maintaining compatibility with existing field terminations, FTBs, MCC interfaces, and inter-building signal routing. 

Project Details

Original Construction Cost:
$535,481
Final Construction Cost:
$535,481
Date of Notice to Proceed:
02/2020
Type of Construction:
Rehabilitation
Substantial Completion:
12/2020
Project Manager:
Jose Martinez
Project Superintendent:
Martin Palacios
Major Subcontractor:
Boyer Self Performed