Kroger Distribution Electrical

Location: Houston, TX
Project Type: Upgrades
Owners:
Kroger Logo
Kroger | Quincy Parker | 713.672.5284

Project Scope

Performed comprehensive 15KV medium voltage electrical infrastructure upgrades at Kroger Distribution, including planning, material procurement, and pad design for new MV switch and transformer installations. Demolished existing rooftop and underground raceways, removed obsolete feeders, and installed new primary and secondary conduits, pull boxes, and supports. Coordinated multiple scheduled outages, temporary power setups, and generator connections to maintain operations. Set and anchored new MV switchgear and PMT, pulled and spliced feeders between manholes, poles, and switchgear, and completed megger testing and Shermco commissioning support. Repaired damaged duct banks, replaced transformers and risers, restored paving and concrete, and resolved unforeseen field conditions to ensure reliable system energization. 

Project Details

Original Construction Cost
$355,595
Final Construction Cost
$418,187
Date of Notice to Proceed
06/2017
Type of Construction
Upgrades
Substantial Completion
10/2018
Project Manager
Ryan Divin
Project Superintendent
Tim Adam
Major Subcontractor
Boyer Self Performed