Project Scope
The project consisted of Lining and Grouting 100’ long, 11’x7’ storm sewer using Danby PVC Grouted-In-Place Lining System. The project involved an internal by-pass system with 2-8” submersible electric pumps with a total capacity of 6,000 gpm. The liner was installed as a panel system with top and bottom panel. The primary objective of this rehabilitation was to prevent infiltration of water and contaminant from the surrounding soil into the culvert.