Janney Run Storm Culvert Lining Phase 1 Pilot Test

Location: Baltimore, MD
Project Type: Rehabilitation
Owner:
Geo Trans, Inc.
(410) 990-4607
General Contractor:
SPEC Consulting, LLC
(518) 453-2203

Project Scope

The project consisted of Lining and Grouting 100’ long, 11’x7’ storm sewer using Danby PVC Grouted-In-Place Lining System. The project involved an internal by-pass system with 2-8” submersible electric pumps with a total capacity of 6,000 gpm. The liner was installed as a panel system with top and bottom panel. The primary objective of this rehabilitation was to prevent infiltration of water and contaminant from the surrounding soil into the culvert.

Project Details

Original Construction Cost:
$375,400
Final Construction Cost:
$414,000
Date of Notice to Proceed:
07/10
Type of Construction:
Rehabilitation
Original Substantial Completion:
09/10
Actual Substantial Completion:
09/10
Final Payment Dates:
12/10
Project Manager:
Datta Shirodkar
Project Superintendent:
Dan Cassel
MEP subcontractors:
Boyer Self Performed
Length of Relationship with Owner:
6 Years