Intake Structure and Pump Can Encasement
Location: Highlands, TX
Project Type: Rehabilitation
Project Type: Rehabilitation
Client:


San Jacinto River Authority
Donnie Morrison, Project Construction Mgr
281 382-6035
Coastal Water Authority – Greg Olinger, Chief PE
281 576-2269
Engineer:
Freese & Nichols
Alan Hutson, PE 713 600-6853
Project Scope
The East Canal Pump station is an 8.25MGD pump station which will be constructed on the SJRA's Highland System. The project consists of intake facilities, a flow metering vault, butterfly valve vault, pump station building, discharge facilities and site development.