Project Scope
Removal of existing siphon pipes
and installation of 96” HOBAS siphon pipe with associated structures on an un-interruptible
live canal. The Work included, but was not limited to, new siphon pipe,
headwalls, wing walls, approach slabs, toe walls and rip rap. Canal flow
of 110 MGD was maintained throughout entire project with a Canal Bypass.