Project Scope
Installation of two siphon structures and removal of temporary stabilized construction exit(s) on the levee(s); design and install a water tight cofferdam system; maintain existing SJRA canal flow of approximately 65MGD; installed two (2) CCFRPM siphon pipes, headwalls, inlet and outlet box structures, weir baffle walls.