Biosan Collection System Pipeline Upgrade –Phase 1

Location: Bayport Facility, Pasadena, TX
Project Type: New
Owner:
Gulf Coast Authority | Jonte L. Greer, Assistant Director | General Engineering
Engineer:
Parsons | Jainil Shah, Sr. Project Manager

Project Scope

Constructed approximately 7000’ of fiberglass pipe (2” thru 42”) and 650’ of stainless steel pipeline including isolation valves, expansion joints, check valves, ph and pressure instrumentation, foundation and supports, autosampler tubing, flow meter, transmitter and associated wiring.  Pipeline installation included 54” x 100’ bore under Union Pacific Railroad, 48” x 350’ bore under Bay Area Boulevard, and 21 MGD bypass pump system. 

Project Details

Original Construction Cost:
$19,116,000
Final Construction Cost:
$19,695,668
Date of Notice to Proceed:
03/2020
Type of Construction:
New
Substantial Completion:
05/2023
Project Manager:
Nathan Davis
Project Superintendent:
Larry Currie
Major Subcontractor:
Corrosion Products of Texas