First Step Tank Addition

Location: Bayport, TX
Project Type: Maintenance
Owner:
gca
Gulf Coast Authority | Jonte Greer | Assistant Director General Engineering | 281.226.1127
General Contractor:
Garney Companies | Cody Schmidt | Project Manager | 660.221.7382
Engineer:
Kalluri Group, Inc. | Ramesh Kalluri, PE | 713.365.9288

Project Scope

Subcontractor to Garney Companies, Boyer furnished and installed all electrical and instrumentation for the Jet Mixing System and New Pre-stressed Tank.  The electrical system included all cable trays, supports, connectors, wire, raceways, lighting systems, including light poles and fixtures, underground power systems, grounding system, instrumentation and control components.  Installed and configured all instrumentation to a termination strip located inside the existing MCC building to the existing PLC panel (building and panel are by others).  

Project Details

Original Construction Cost
$2,155,327
Final Construction Cost
$2,731,318
Date of Notice to Proceed
04/2019
Type of Construction
Maintenance
Substantial Completion
05/2021
Project Manager
Jose Martinez
Project Superintendent
Jason Divin
Major Subcontractor
Prime Controls