Project Scope
Lower 141 LF of existing 30” intake barrels 30’
into Lake Granbury and install 30’ of 30” intake barrels that will supply water
to the Exelon Power Plant even in low lake levels. Prior to lowering the intake barrels, 2 new
36” piers were drilled and poured, along with a 26’x4’ beam cap to support the
lowered structure. Support was provided
for the removal and reinstallation of 3 pump and motor assemblies. The scope included removal, cleaning and
repairing (2) 8’x14’ Intake screens, as well as installing 1 new 8’x14’ Intake
screen and extending cathodic protection.
Diver support was needed to successfully complete the project.