Project Scope
Installed underground electrical and telecommunications conduits under Port Road at the Bayport Container Terminal. Project consisted of two 24” dry bores under Port Rd, 100 LF of 36” steel casing open cut through the EMMCO Corridor, and three 8’x8’x 8’ Precast Manholes. ?Upon completion this section energized the newly constructed Container Yards 6 and 7 to the existing Port of Houston Substation.