Project Scope
Installation of the 22.4 MVA (3,126 Amps) 138kV primary to 4.16kV
secondary transformer. This project entailed the procurement and
installation of one 22.4MVA 138kV to 4.16kV Sub-Station Transformer including
the onsite assembly of Radiators, Fans, HV and LV Bushings. The filling and
moisture processing of approximately 7,000 gallons of Type II Mineral Oil. Custom
fabrication of Cable Support System and Cable Buss Terminations into the
existing 5000Amp Buss Duct connection to the HSPS Plant 3, 4.16KV Electrical
Switchgear. Complete commissioning and functionality testing to include the
Engineering and Programming of Relay Protection Settings.