Eagle Mountain Lake Outfall

Location: Fort Worth, TX
Project Type: Pipe Installation
Owner:
Wesley Cleveland 817-335-2491
Engineer:
Freese & Nichols
Alan Hutson, Deputy Project Mgr. 817-735-7300

Project Scope

Construction of 78-inch subaqueous pipe and outlet structure at the Eagle Mountain Outlet. Includes fabrication of outfall structure, delivery to site, installation of structure 700 feet from the shoreline in the lake, excavation of trench below the lake bottom, installation of the subaqueous pipe (78” diameter, Hobas) by means of pulling pipe from shoreline and connecting it to the outfall structure, backfilling the trench and pipe, installing rip rap and protection buoys and restoring the onshore conditions. All permanent materials were supplied by the Prime Contractor.

Project Details

Original Construction Cost:
$1,666,321
Final Construction Cost:
$1,666,321
Date of Notice to Proceed:
10/06
Type of Construction:
Pipe Installation
Original Substantial Completion:
02/07
Actual Substantial Completion:
02/07
Final Payment Dates:
03/07
Project Manager:
Gordon Reavis
Project Superintendent:
Emmitt Malmay
MEP subcontractors:
Boyer Self Performed
Length of Relationship with Owner:
10 Years