Dallas Salmon WWTP Re-Lift Pump Addition WW2103A

Location: League City, TX
Project Type: Rehabilitation
Owner:
City of League City | Marcos Garcia | 281.544.1486
Engineer:
Ardurra | Jeff Peters, PE | 713.385.5601

Project Scope

Boyer installed an additional re-lift pump to the Dallas Salmon Wastewater Treatment Plant Re-Lift Pump Station. The scope of work included rehabilitation of the existing pump station header along with the existing pump can and base installation of one vertical mixed flow pump and associated electrical and instrumentation work, including one adjustable speed drive. Performed vibration analysis complete with start-up and testing. Boyer also performed the de-watering and temporary bypass of the system to perform a thorough inspection of the underground sewer line infrastructure utilizing confined space and safe work practices.

Project Details

Original Construction Cost
$750,750
Final Construction Cost
$640,850
Date of Notice to Proceed
08/2024
Type of Construction
Rehabilitation
Substantial Completion
12/2025
Project Manager
Matthew Rush
Project Superintendent(s)
Mitchel Rubenstein
Major Subcontractors
Boyer Self Performed