Project Scope
Boyer installed an additional re-lift pump to the Dallas Salmon Wastewater Treatment Plant Re-Lift Pump Station. The scope of work included rehabilitation of the existing pump station header along with the existing pump can and base installation of one vertical mixed flow pump and associated electrical and instrumentation work, including one adjustable speed drive. Performed vibration analysis complete with start-up and testing. Boyer also performed the de-watering and temporary bypass of the system to perform a thorough inspection of the underground sewer line infrastructure utilizing confined space and safe work practices.