Emergency Repairs - WCID#111 Huntington Bayou WWTP

Location: Houston, TX
Project Type: Rehabilitation
Owner:
City of Houston | William Fuller, Project Manager | 281.435.6962
Engineer:
City of Houston

Project Scope

City of Houston issued EPO (Emergency Purchase Order) to abandon in?place an existing 42” concrete sanitary sewer that add multiple failures from existing MH No. 1 to the existing junction box outside of the effluent lift station. ?A 42” HOBAS Pipe was placed adjacent to the existing 42” concrete sanitary sewer for a distance of 670 LF at a depth of 32’. Means and methods were open cut and jack and tunnel due to utilities in the plant. The plant remained in full operation therefore a bypass system was put in place to handle sewage from MH No. 1 to the effluent lift station. In addition, due to the depth, a dewatering system ran the length of the repair to handle ground water which was at a depth of 30’. The junction box was relined with a raven epoxy while the by-pass system was running.?? ? 

Project Details

Original Construction Cost:
$2,554,350
Final Construction Cost:
$2,608,862
Date of Notice to Proceed:
1/2024
Type of Construction:
Rehabilitation
Substantial Completion:
04/2024
Project Manager:
Barry Buse
Project Superintendent:
Fred Powell
Major Subcontractor:
Sunbelt Rentals