Clinton Drive Emergency Point Repair 60” Force Main 

Location: Houston, TX
Project Type: Rehabilitation
Owner:
City of Houston
Construction Manager:
PM Construction & Rehab, LLC a PURIS Company | Jack Simmons, PMP, Project Manager | 281.714.7048

Project Scope

We closed three lanes of traffic on Clinton Drive to facilitate critical repairs to three separate damaged sections of a 60-inch Hobas force main. The objective was to restore Clinton Drive to its original condition. One repair site was complicated by an active 8-inch CenterPoint gas line situated directly above the damaged pipe; this specific repair required the application of both a fiberglass wrap and a Hobas pressure coupling to ensure integrity and safety. 

Project Details

Original Construction Cost:
$1,044,777
Final Construction Cost:
$1,044,777
Date of Notice to Proceed:
02/2024
Type of Construction:
Rehabilitation
Substantial Completion:
04/2024
Project Manager:
John Tompkins, PE
Project Superintendent(s):
Juan “Burger” Hernandez, II
Major Subcontractor:
Boyer Self Performed