Project Scope
We closed three lanes of traffic on Clinton Drive to facilitate critical repairs to three separate damaged sections of a 60-inch Hobas force main. The objective was to restore Clinton Drive to its original condition. One repair site was complicated by an active 8-inch CenterPoint gas line situated directly above the damaged pipe; this specific repair required the application of both a fiberglass wrap and a Hobas pressure coupling to ensure integrity and safety.