Project Scope
Removal,
disposal and replacement of 500ft. of 18” carbon steel clarifier piping with
new ceramic epoxy lined piping. Included
3D laser scan survey for dimensional verification, modification and
installation of existing concrete and metallic pipe supports and hydrostatic
testing with clarifier startup.