Project Scope
Installation of approximately 2,500 LF of 30”-36” gravity sanitary sewer lines via Pilot Tube Micro tunnel method. Rehabilitation of four existing Lift Station sites including bypass pumping, installing new pumps and piping, elevated platforms, SCADA and Electrical and paving. Construction of detention ponds, coating of Lift Station walls and piping with new fencing. Construction of a new 3-MGD Lift Station including electrical and demolition of an existing Lift Station.