Project consists of stabilization of the Bayou edges with Gabion Walls, Concrete Hike and Bike Trails, Structural/Architectural Concrete Steps and Walls, Pedestrian Bridge, Embankment Grading, Irrigation System, Landscape, High Tech Lighting/Electrical and Site Furnishings with the following mission: Team commitment to transform the downtown corridor into a quality environment.