69th Street WWTP RAS PS #6 Emergency Rehab

Location: Houston, TX
Project Type: Rehabilitation
Owner:
city houston
City of Houston
Engineer:
City of Houston | Florin Bonteanu 832.395.6108

Project Scope

Completed full restoration, rebuild, and testing of the RAS Pump Station MCCs and associated equipment following flooding and temporary shutdowns. Work included removing, cleaning, and rebuilding MCC buckets with new starters, overload relays, control transformers, switches, and status lights; installing and energizing VFD cabinets; reconnecting pumps, mixers, clarifiers, and fans; replacing transformers, flow meter transmitters, and 120/240V panels; testing and verifying auto PLC functions and SCADA system integration; correcting wiring and status issues; and reinstalling all control equipment. Temporary power was disconnected, final system functionality confirmed, and site cleanup, debris disposal, and material staging were completed, leaving the facility fully operational and compliant. 

Project Details

Original Construction Cost
$342,428
Final Construction Cost
$465,754
Date of Notice to Proceed
09/2021
Type of Construction
Rehabilitation
Substantial Completion
12/2021
Project Manager
Jose Martinez
Project Superintendent
Russell Iannicelli
Major Subcontractor
Boyer Self Performed