2nd Step Walkway Emergency Removal & Replacement – Bayport Facility

Location: Pasadena, TX
Project Type: Installation
Owner:
Gulf Coast Authority | Jonte L. Greer, PMP | 832 205-6697
Engineer:
Parsons | Robert E. McFadden, PE | 713 823-4954

Project Scope

Boyer was selected to perform an emergency design-repair project on an elevated aeration basin inside a waste water treatment plant. The project consisted of two phases:   
Phase One:  Rapidly designing  and deploying a support system to capture and hold a 25-ton failing concrete structure 30 feet in the air while  a new support frame was fabricated for a replacement. Boyer self-performed the design and installation of the support system including an automated floatation control system to maintain and equalize buoyant forces on the failing structure for an extended period of time and through extreme rain events.   
Phase Two:  Expediting  the fabrication and installation of a 15-ton 55 foot-long galvanized support structure. This was followed by  the delectate removal of the existing and elevated 25-ton post-tensioned concrete structure inside the basin.  
The project was completed on time and within budget, and it ensured the continued operation of the treatment plant  with no impact to the existing structure. The successful completion of this project demonstrates Boyer's expertise in  emergency design repair projects, as well as its ability to meet the challenging demands of this type of work. 

Project Details

Original Construction Cost:
$745,650
Final Construction Cost:
$745,650
Date of Notice to Proceed:
10/2019
Type of Construction:
Installation
Substantial Completion:
02/2020
Project Manager(s):
Nathan Davis | John Tompkins
Project Superintendent:
Larry Currie
Major Subcontractor:
Boyer Self Performed