Project Scope
Installation of a structural wrap on a 42 inch CS waste water pipeline approximately ` 340 feet in length, as well as demolishing and removal of 14 existing pipe supports; install nineteen new shoe pipe supports and demolishing existing supports. The pipeline was currently in operation.