
24” Waterline from 59th Street to 30th Street
Location: Galveston, TX
Project Type: Rehabilitation
Project Type: Rehabilitation
Owner:


City of Galveston
Eric Wilson 409 797-3630
Engineer:
Dannenbaum Engineering
Carl McConnell, PE 713 520-9570
Project Scope
Installation of a water distribution line and the termination of service to and from the 59th St. Pump Station approximately 13,000LF of piping connections to existing water lines, in-line valves and fire hydrants.

