Project Scope
Micro tunnel lengths up to 600’ completed
through mid-town and downtown Houston , one reach completed under I-45 (Pearce
Elevated) all runs contained 8” PVC duct for 138 KV cables, special grouting
for thermal dissipation of heat from conductor to earth. Depth of tunnels
ranged from 20’ to 30’ below city streets. Contractor had to maintain two lanes
of traffic flow during complete project. Boyer designed all shoring systems and
implemented trench safety plan for project, total of 26 tunneling shafts were
constructed and removed. All roads were restored to City of Houston
specifications.